Architectural, structural, MEP and civil drawings for New York projects – drawn to the code your city or county has adopted and sealed by an engineer licensed in New York where required.

Outside New York City, the 2025 NYS Uniform Code and 2025 Energy Code took effect December 31, 2025. New York City enforces its own NYC Construction Codes.
Engineering is sealed by an engineer licensed through the NYS Education Department, Office of the Professions. NYSED accepts an electronic version of the seal.
Projects in the five boroughs are designed to the NYC Construction Codes, which differ from the rest of the state. Tell us the borough and scope.
Codes change and local amendments vary. We confirm the exact requirements for your address in your quote. Information checked October 2026.
Floor plans, elevations, sections and complete permit sets drawn in CAD.
Foundations, framing, beams, retaining walls and stamped calculations.
Coordinated mechanical, electrical, plumbing and fire protection design.
Site plans, grading, drainage, stormwater, utilities and parking.
Your drawings reviewed, corrected as needed and sealed for permit.
Permit packages, code coordination and answers to reviewer comments.
Outside New York City, the 2025 NYS Uniform Code and 2025 Energy Code (in effect since December 31, 2025). Inside the city, the NYC Construction Codes. Your town or village may also have local requirements, which we confirm for your address.
Yes. NYC projects are designed to the NYC Construction Codes. Tell us the borough, building type and scope for a quote.
Yes. Where a seal is required, your drawings are sealed by an engineer licensed in New York.
Yes, where accepted. NYSED accepts an electronic version of the seal, but some agencies still ask for paper – in that case we provide wet-stamped sets.
It depends on the project and where it is. Send your details for a fixed price in 5-10 minutes on average.
Tell us about your project and attach any plans or photos. An engineer replies with the scope, price and delivery date.