Skip to main content

SitePlaners

Home › Project Types › ADU Plans
ADU Plans

Planning an ADU, Backyard Cottage or Garage Conversion?

Permit plans for detached, attached, garage-conversion and junior ADUs – floor plans, site plan, structural and MEP, coordinated in one package.

Detached ADU floor plan with site key plan and setbacks
  • Serving All 50 States
  • Sealed & Stamped
  • Drawn In-House in CAD
  • Quotes in 5-10 Min
Not Sure What You Need?

What Does Your City Need to Approve an ADU?

ADU rules change from city to city: size limits, setbacks, height, parking, owner-occupancy and utility connections. Most cities ask for a site plan, floor plans, elevations, structural details and energy and MEP information.

Send us your address and what you want to build. We check your local ADU rules first, then prepare a complete set designed to pass review the first time.

You Most Likely Need This If You Are:

What's Included

What Will You Get for Your ADU?

Choose a tab for the details.

Site Plan & Setbacks

Lot, setbacks, utilities, access path and parking as your city requires.

Floor Plans & Elevations

Layouts, kitchens, baths, windows and exterior views.

Structural Design

Foundation, framing and lateral design with calculations.

MEP & Energy

Electrical, plumbing, HVAC and energy code documents.

Garage Conversions

Slab, wall, egress and insulation upgrades to make a garage livable.

Permit Support

Corrections answered until your ADU permit is issued.

A Complete ADU Permit Set

We coordinate architecture, structure and MEP so your ADU set is consistent and ready to submit – sealed where your jurisdiction requires it.

Detached ADU floor plan with site key plan and setbacks
How It Works

How Do I Get My ADU Plans? 4 Simple Steps

1. Send Your Project

Address, scope and any plans, photos or plan-check comments.

2. Get a Fixed Price

Scope, price and delivery date in 5-10 minutes. Nothing starts until you approve.

3. We Design & Draft

Drawings and calculations prepared in CAD to your local code.

4. Ready to Submit

Sealed and stamped where required. PDFs (and CAD on request).

Questions Clients Ask

Your Questions About ADU Plans, Answered

Most cities need complete construction drawings; structural design usually needs engineering, and some jurisdictions require sealed drawings. We prepare the full set and seal where required.

Size limits depend on your city and state and often on your lot size. We check your local rules before designing.

Yes. We design the conversion – including slab, insulation, egress windows and utilities – and document what must change to meet code.

Plan review time is set by your city. A complete, coordinated set helps avoid extra correction rounds.

It depends on size and type. Send your address and idea for a fixed price in 5-10 minutes.

You May Also Need

Still have a question? Ask an engineer – we answer in minutes.
Free Quote - Fast Response

How Much Will My ADU Plans Cost? Price in 5-10 Minutes

Tell us about your project and upload any plans, sketches or photos you have. An engineer reviews every request personally and replies with a clear scope, price and delivery date – typically within 5 to 10 minutes.

Prefer to Talk First?

Request Your Free Quote