Skip to main content

SitePlaners

Home › Project Types › Change of Use
Change of Use

Changing How a Building Is Used?

Change of use and change of occupancy documents – code analysis, egress, accessibility and system upgrades for your permit.

Plan-check comment response sheet with revision clouds and responses
  • Serving All 50 States
  • Sealed & Stamped
  • Drawn In-House in CAD
  • Quotes in 5-10 Min
Not Sure What You Need?

Does Your New Use Trigger Code Upgrades?

Turning a house into an office, a warehouse into a gym or a store into a restaurant changes the building’s occupancy. That can trigger upgrades to exits, fire separation, accessibility, ventilation, plumbing fixtures and even structure.

Tell us the current and planned use and send any drawings. We analyze what your new use requires and document it for your permit.

You Most Likely Need This If You Are:

What's Included

What Will You Get for Your Change of Use?

Choose a tab for the details.

Code & Occupancy Analysis

Current vs. proposed occupancy and what the code requires.

Egress & Life Safety

Exits, travel distances, occupant loads and fire separations.

Accessibility

Accessible routes, entrances and restrooms.

Structural Review

Floor loads and lateral checks for the new use.

MEP Upgrades

Ventilation, plumbing fixtures, power and fire protection.

Existing Building Drawings

As-builts where no current drawings exist.

A Clear Path to Your New Use

We show the reviewer how the building meets the requirements for its new use – and what needs to change – in one coordinated set.

Plan-check comment response sheet with revision clouds and responses
How It Works

How Do I Get My Change of Use Plans? 4 Simple Steps

1. Send Your Project

Address, scope and any plans, photos or plan-check comments.

2. Get a Fixed Price

Scope, price and delivery date in 5-10 minutes. Nothing starts until you approve.

3. We Design & Draft

Drawings and calculations prepared in CAD to your local code.

4. Ready to Submit

Sealed and stamped where required. PDFs (and CAD on request).

Questions Clients Ask

Your Questions About Change of Use Plans, Answered

A change in how a building is used that puts it in a different code occupancy group, such as from business to assembly.

Sometimes. It depends on the new occupancy, size and building construction. Our code analysis answers this.

Usually yes – the city still needs to see that the building meets the new use’s requirements.

We create as-built drawings from measurements and photos.

Send the address and the current and new use for a fixed price in 5-10 minutes.

You May Also Need

Still have a question? Ask an engineer – we answer in minutes.
Free Quote - Fast Response

How Much Will My Change of Use Plans Cost? Price in 5-10 Minutes

Tell us about your project and upload any plans, sketches or photos you have. An engineer reviews every request personally and replies with a clear scope, price and delivery date – typically within 5 to 10 minutes.

Prefer to Talk First?

Request Your Free Quote