Skip to main content

SitePlaners

Home › Services › Cost Estimating & Takeoffs
Cost Estimating & Quantity Takeoffs

How Much Will Your Project Cost to Build?

Construction cost estimates, quantity takeoffs and bills of materials from your drawings – so you can budget, compare bids and avoid surprises.

Quantity takeoff sheet with BOQ table and cost by trade chart
  • Serving All 50 States
  • Sealed & Stamped
  • Drawn In-House in CAD
  • Quotes in 5-10 Min
Before You Build

Do You Know What Your Project Will Really Cost?

Budgets usually go wrong before construction starts – a missed quantity, an outdated price or a bid that leaves something out. A takeoff from the actual drawings shows exactly what is needed and what it should cost.

Send us your drawings and location. We measure quantities, apply regional pricing and give you a clear breakdown by trade that you can use with lenders, owners and contractors.

An Estimate Helps If You Are:

What's Included

What Will You Get?

Choose a tab for the details.

Preliminary Budgets

Early cost ranges from sketches or concept plans.

Detailed Cost Estimates

Line-item estimates by trade with labor and materials.

Quantity Takeoffs

Concrete, rebar, lumber, drywall, roofing, flooring, MEP and sitework quantities.

BOQ & Bill of Materials

Bill of quantities and materials lists ready for suppliers.

Bid Comparison

Contractor bids compared line by line to spot gaps and outliers.

Value Engineering

Cost-saving alternatives that keep the design intent.

Clear Numbers You Can Act On

Quantities are measured from your drawings and priced for your region, presented in a spreadsheet you can edit, with a summary by trade and the assumptions listed.

Quantity takeoff sheet with BOQ table and cost by trade chart

Pick your project type for details, typical requirements and pricing.

How It Works

How Do I Get My Estimate? 4 Simple Steps

1. Send Your Project

Address, scope and any plans, photos or plan-check comments.

2. Get a Fixed Price

Scope, price and delivery date in 5-10 minutes. Nothing starts until you approve.

3. We Design & Draft

Drawings and calculations prepared in CAD to your local code.

4. Ready to Submit

Sealed and stamped where required. PDFs (and CAD on request).

Questions Clients Ask

Your Questions About Cost Estimates, Answered

Accuracy depends on how complete your drawings are. Concept-level budgets are typically a range; detailed estimates from complete drawings are much tighter. We state the expected accuracy in every estimate.

Regional unit costs for your project location, adjusted for current market conditions. Your own supplier or subcontractor prices can be used if you provide them.

Yes – we provide quantity takeoffs by trade so you can price and submit bids faster.

Your drawings (PDF or CAD), the project location and any specifications or finish selections.

No – an estimate is a professional opinion of probable cost. Actual bids depend on the market, the contractor and site conditions.

Free Quote - Fast Response

How Much Will My Estimate Cost? Price in 5-10 Minutes

Tell us about your project and upload any plans, sketches or photos you have. An engineer reviews every request personally and replies with a clear scope, price and delivery date – typically within 5 to 10 minutes.

Prefer to Talk First?

Request Your Free Quote