Skip to main content

SitePlaners

Home › Resources
Resources & Guides

Want to Understand Your Permit Before You Spend a Dollar?

Short, plain-English guides on what building departments ask for, when you need an engineer and how to avoid the most common delays.

Architectural floor plan permit sheet with rooms, dimensions and front elevation
  • Serving All 50 States
  • Sealed & Stamped
  • Drawn In-House in CAD
  • Quotes in 5-10 Min
Guides

Which Question Is Keeping Your Project Waiting?

Each guide takes two minutes and links to the service that solves it.

When Do I Need an Engineer's Seal?

Which projects usually need sealed drawings, which do not, and how to find out for your city.

Removing a Load-Bearing Wall

How to tell if a wall is load-bearing and what the permit needs.

ADU Rules Explained

Size limits, setbacks and the drawings most cities ask for.

What Is a Plan-Check Comment?

How to read a correction letter and get your permit approved faster.

Grading & Drainage Basics

Why reviewers ask where the water goes - and what a grading plan shows.

Solar Structural Letters

What installers and AHJs expect in a roof structural letter.

Electrical Service Upgrades

When a panel upgrade needs a load calculation and plans.

Old Plans to CAD

How as-builts and PDF-to-CAD conversions work.

Budgeting Before You Build

How a cost estimate or takeoff saves money later.

Quick Answers

Common Questions, Answered in One Line

Free Quote - Fast Response

What Will Your Project Cost? Get a Free Quote in 5-10 Minutes

Tell us about your project and upload any plans, sketches or photos you have. An engineer reviews every request personally and replies with a clear scope, price and delivery date – typically within 5 to 10 minutes.

Prefer to Talk First?

Request Your Free Quote