Solar structural letters, PV and battery plans, EV charger designs and energy code documents – fast turnaround for homeowners and installers.

Most solar permits need two things: proof the roof can carry the panels (a structural letter or calculation) and an electrical plan showing how the system connects. EV chargers and batteries often need a load calculation to show the service can handle them.
New buildings and major remodels may also need energy code forms. Tell us your address and system size and we will confirm exactly which documents apply.
Choose a tab for the details.
Roof framing review and attachment checks for wind and snow loads.
Array layout, single-line diagram, labels and interconnection details.
Load calculation, circuit sizing and site plan for home or commercial chargers.
Structural design and foundations for carport and canopy structures.
NEC load calculations to support solar, batteries and EV charging.
Energy compliance forms and envelope, lighting and HVAC documentation.
Structural letters and electrical plans are prepared to the code edition your jurisdiction uses and sealed where required, with fast turnaround so crews stay on schedule.

Pick your project type for details, typical requirements and pricing.
Address, scope and any plans, photos or plan-check comments.
Scope, price and delivery date in 5-10 minutes. Nothing starts until you approve.
Drawings and calculations prepared in CAD to your local code.
Sealed and stamped where required. PDFs (and CAD on request).
Many jurisdictions require a structural letter or calculation confirming the roof can carry the panels and racking. We review your roof framing and provide it.
Often, yes – especially Level 2 chargers on older services. The calculation shows whether your existing service can handle the new load or needs an upgrade.
Yes. We support installers with fast, repeatable structural letters and electrical plans. See our page for Solar & EV Installers.
The NEC edition and building code your jurisdiction has adopted, including local amendments and utility requirements.
Typical solar letters and EV plans are quick turnaround. Your quote states the delivery date up front.
Yes. Send us the plan-check comments. We prepare the structural letter or electrical corrections the reviewer asked for.
Usually, yes. Most cities ask for an electrical plan and sometimes a load calculation. Tell us your city and we confirm.
It depends on the roof and the system. Send the details for a fixed price in 5-10 minutes on average.
Roof framing photos, rafter size and spacing, roof material and the panel layout. We tell you exactly what to measure if anything is missing.
Tell us about your project and attach any plans or photos. An engineer replies with the scope, price and delivery date.