Skip to main content

SitePlaners

Home › Project Types › Electrical Service Upgrade
Electrical Service Upgrade

Upgrading Your Electrical Panel or Service?

NEC load calculations, one-line diagrams and panel schedules for service and panel upgrades – for EV chargers, heat pumps, solar and additions.

Electrical one-line diagram, panel schedule and NEC load calculation
  • Serving All 50 States
  • Sealed & Stamped
  • Drawn In-House in CAD
  • Quotes in 5-10 Min
Not Sure What You Need?

Can Your Electrical Service Handle What You Are Adding?

Adding an EV charger, heat pump, hot tub, addition or solar can push an older service past its limit. Utilities and building departments often ask for a load calculation to prove the service is adequate – or to justify an upgrade.

Send a photo of your panel, the main breaker size and what you are adding. We calculate the load and tell you whether you need an upgrade.

You Probably Need One If You Are:

What's Included

What Will You Get for Your Electrical Service Upgrade?

Choose a tab for the details.

Load Calculation

NEC Article 220 calculation for your home or building.

One-Line Diagram

Service, meter, panels and feeders on one clear diagram.

Panel Schedules

Circuit-by-circuit schedules for new and existing panels.

Subpanels & Feeders

Feeder sizing and subpanels for additions and ADUs.

EV & Load Management

Load management options to avoid an upgrade where allowed.

Permit Documents

Documents formatted for your utility and permit office.

Clear Proof Your Service Is Sized Right

The calculation, one-line and panel schedule show the reviewer and the utility exactly how your service handles the new load.

Electrical one-line diagram, panel schedule and NEC load calculation

These services work together on this type of project – tap one for details.

How It Works

How Do I Get My Electrical Service Upgrade Plans? 4 Simple Steps

1. Send Your Project

Address, scope and any plans, photos or plan-check comments.

2. Get a Fixed Price

Scope, price and delivery date in 5-10 minutes. Nothing starts until you approve.

3. We Design & Draft

Drawings and calculations prepared in CAD to your local code.

4. Ready to Submit

Sealed and stamped where required. PDFs (and CAD on request).

Questions Clients Ask

Your Questions About Electrical Service Upgrade Plans, Answered

Not always. A load calculation often shows the existing service can handle it, or that load management avoids an upgrade.

The method your jurisdiction accepts – standard, optional (220.82) or existing-load method using utility data where allowed.

A photo of your panel and labels, the main breaker size, the home’s size and what you are adding.

Yes – many of our requests come from electricians who need calculations for permits.

Send your panel photo for a fixed price in 5-10 minutes.

You May Also Need

Still have a question? Ask an engineer – we answer in minutes.
Free Quote - Fast Response

How Much Will My Electrical Service Upgrade Plans Cost? Price in 5-10 Minutes

Tell us about your project and upload any plans, sketches or photos you have. An engineer reviews every request personally and replies with a clear scope, price and delivery date – typically within 5 to 10 minutes.

Prefer to Talk First?

Request Your Free Quote